How long does structural drying take?
Most framed rooms take a few days, while plaster, brick and old wood floors may take longer. The time depends on the material, the amount of water, the temperature and humidity and how quickly the work began. The crew gives an estimate after the first readings and revises it.
There is no honest fixed number, and a promise of one should make you wary. The same volume of water behaves differently in a modern drywall room and in a masonry cellar. A heated, ventilated room dries faster than a cold, closed one, and a sudden cold spell can slow a job that was on schedule the day before.
What the crew can give you is a method: readings on day one, a dry reference, and a visit every day or two to check that the numbers are heading down. If they stall, equipment is moved or changed. The finish line is a measurement, and the work is finished when the measurement says so.
Why do old Manchester buildings dry differently?
Lath-and-plaster walls, brick and stone, balloon framing and thick old floors hold more water and release it more slowly than modern drywall construction. They also contain voids that let water travel. Drying them takes longer and needs more monitoring.
The Amoskeag worker districts, which date mostly from 1838 to 1882, are brick tenement blocks and overseer houses, and the houses of the surrounding neighborhoods include many built before 1940. Walls of that age are often plaster on wood lath over brick, or on studs without fire-blocking, which means a wet wall can be wet from the cellar to the attic. Water that gets into a bay can travel down inside it and show up two floors below the source.
A masonry wall is a heat sink and a moisture reservoir. Brick takes up water and holds it, and a cold wall cannot lose it quickly to cold air. In a New Hampshire winter the air outside has almost no moisture to take, so drying is done by dehumidifiers inside the building rather than by opening windows. Many cellars and mill buildings in the city have little heat, which pushes the plan toward desiccant dehumidifiers that work in cold conditions.
Can you dry in winter, when the heat is off and the air is cold?
Yes, but the plan changes. Cold slows evaporation, so crews use dehumidifiers designed for low temperatures, add controlled heat where safe and avoid opening windows. A frozen or unheated building is dried more slowly, and a frozen building has to be thawed carefully first.
Cold air holds little moisture, which is why a winter cellar feels damp but never seems to dry. Evaporation slows, the dehumidifier's coils frost over, and moisture can condense on the coldest walls. A desiccant machine works well in these conditions because it does not depend on cold coils, and a small amount of added heat can raise the rate of drying without baking the plaster.
In a building where pipes have burst in a cold snap, the first job is to find and stop the water, then thaw and dry. That sequence is covered in burst frozen pipe water damage. Where the water came from a roof, ice dam water damage explains the insulation and ceiling issues that follow.
How do you know the building is dry?
The material is dry when its readings match a dry reference from the same building and stay there on repeat visits. Surface feel and appearance are not enough. The crew records readings at fixed points and removes the equipment only when they match.
A wall can feel dry and still hold water, particularly masonry and plaster. Meters read the moisture content directly, and for materials that meters read poorly, such as thick brick, the crew compares like with like against an unaffected wall. Readings that rebound when the equipment is switched off mean the material was not dry.
Recorded readings are not only for the crew. They protect you if mold shows up later and if an insurer asks what was done. Keep the log, and ask for a copy at the end of the job.